Curing Times
Sufficient catalyst is supplied with the bottle of cement, mixed at a 2:100 ratio or more. Changes of the ratio will alter the curing times, i.e. cure rate can be accelerated by increasing the catalyst.
Room Temperature 22°C (72°F) |
Oven Temperature 70°C (160°F) |
|||
Catalyst Ratio | Pre-Cure | Full-Cure | Pre-Cure | Full-Cure |
2:1000 | 60 minutes | 36 hours | Not recommended! | |
5:1000 | 30 minutes | 1 day | Not recommended! |
Technical Data
Viscosity: 275 cps to 320 cps
Refractive Index: 1,55 at 25°C (full cured) resp. 1,53 (uncured)
Operational Temperature Range: -54°C (-65°F) to +100°C (+212°F)
Shear Strength: 5,200 lb/inch2
Dielectric Contrast: 3 at 106 cps
Water Absorption: 0,3% (24 hours, 25°C)
Shrinking in Cure: approx. 4%
pH: 3,2
Specific Gravity: 1,22
Shore D Hardness: approx. 90
Thermal Conductivity: 500 x 10–6 cal (sec) (cm2) (°C) (cm)
Flash Point (uncured): 50°C
Outgassing CVCM: 0.1 %
Shipping and Storage: No special handling; should be kept from intense light and elevated temperatures.
Shelf Life: 18 months from date of manufacture
Packing Size: 114 g (4 oz).